Arranta Bio
Learn how Black Bear Coatings & Concrete transformed Arranta Bio's new facility with Dur-A-Flex seamless flooring systems.
The Right Floor for Each Project
Learn how Black Bear Coatings & Concrete transformed Arranta Bio's new facility with Dur-A-Flex seamless flooring systems.
Seamless floors are an excellent choice for arenas. Learn how Xtream Arena benefitted from a Dur-A-Chip flooring system.
Learn how this large distribution center benefitted from a Poly-Crete resinous flooring solution.
The quick cure of Accelera Fast-Track Flooring allowed installation overnight; the store was able to resume business as usual the next day.
Nation’s largest truck company upgrades floors in 24/7 service area without revenue loss!
The modern office is set upon a bare concrete surface and the owners were looking for something more for their main entrance to match the impressive look of the rest of the space.
Realizing that a floor upgrade would make a major impact on the overall look of the store, the Cornwells set out to find something new and exciting.
Decorative flooring install meets critical deadlines and increases safety!
Animal Rescue Organization looks for flooring solution that is simple to clean and offers a uniform appearance; finds solution with Dur-A-Flex's Hybri-Flex MC.
The floor needed to be slip resistant and decorative and able to tolerate the conditions seen in surgical rooms, indoor/outdoor kennels and waiting areas.
After three years of flooring research, COO finds Dur-A-Flex floor to be the perfect choice!
Careful planning and installation expertise were the opening acts to the headlining floor system and with over 100,000 square feet installed…this show is a hit!
The floor’s design was to depict the stitching of a baseball, creating a focal point with a purpose - to subtly direct customers throughout the store and maximize merchandise exposure.
The concrete floors in the concourse area of the Times Union Center were old and tired looking and the repeated waxing that had been done over the years was causing slip/fall issues.
A leading manufacturer of biomedical testing instruments was in need of a new flooring system that would eliminate the constant repairs caused by high vapor emissions.
With a 100,000 square foot facility in design, it was imperative that the correct floors be chosen to serve as the ”foundation” of this world-class facility.
Bow Tie Cinemas turned to Dur-A-Flex to create a decorative and inviting entrance to their facility all while keeping the facility open to patrons throughout construction.
As one of the busiest tourist attractions in the country, The Space Needle needed to upgrade their floors but couldn't afford to shut their doors.
To battle the elements and restore the beauty of the well-renowned retreat, Dur-A-Flex’s Hybri-Flex® MQ Floor system was chosen.
TV news studio updates their 80s look.
The hospital needed a durable system that could be installed quickly and still allow them to conduct their every day emergency landings.
Although this large area had more than 300 stains marring it, it was apparent that Dur-A-Flex was the solution to turn Parkland’s CUP into a showpiece.
They are committed to delivering excellence in the service they provide to their patients, starting with their care and extending down to their facility’s floors.
More than 100,000 square feet of flooring at the Brooklyn Cruise Terminal needed restoration after super-storm Sandy.
This restaurant turned to Dur-A-Flex for a one-of-a-kind decorative floor that could stand up to the traffic of a busy establishment.
"Now, when customers come through our doors, the first thing that literally every single person says is ‘I love the floors!’ - John Jacobi, J's White Elephant.
“Believe it or not, I’m actually looking forward to cleaning it. It’s so easy spraying it down and it all goes right down the drain!”
The Poly-Crete HF trowel down system offers moisture tolerance and thermal shock tolerance.
To ensure their new floors would serve as a hygienic surface that would withstand the various ingredients, they turned to seamless flooring as the solution.
“The concrete alone could not withstand the rigors of beer making and needed some form of protection,” says owner Omar Robinson.
The owners knew this area, in particular, would need the right floor system to stand up to the abuse that comes with the distilling process - most importantly a floor with great chemical resistance.
Turning the existing industrial building into one suitable for meat processing posed a challenge, specifically when it came to the flooring.
See the time lapse video of this 4-coat application process, which was completed in just 5 days.
With a budget to stick to, tough decisions needed to be made of what was essential for the new facility. One non-negotiable item? An epoxy floor system.
“Since the 2005 install, the station still looks like new with no peeling or wear and remains a place of ownership pride,” says Paul Burton, Fire Chief.
It was decided that a Dur-A-Flex floor system would be cost-effective and provide the desired decorative look while meeting the school’s budget.
Dur-A-Flex’s Dur-A-Gard SL system was chosen for its durability, stain resistance and ability to install quickly to minimize downtime.
Avenues: The World School of New York, NY needed floors that would entice potential students to further their education with them while looking great and providing an anti-slip surface.
“I felt confident that, with their reputation both skill-wise and their flooring systems, the University was in good hands,” says FAU’s Paulo Brida, Facilities Planning.
The dealership's floor was in need of major repair—two prior epoxy coatings were failing, the concrete was cracked and the surface was covered with gasoline, motor oil and dirt.
The new facility was designed to showcase a sleek look that would start with the exterior of the building and extend throughout the facility, including the floors in the workhorse area of the dealership - the service bays!
Dur-A-Flex, please pimp my floor!
Utilizing products that qualified for LEED® credits was a key component to this project.
Focused on the safety of the hospital staff and patients, administrators agreed a flooring solution was critical; Dur-A-Flex's Cryl-A-Chip SL system was chosen.